Quality evidence

Built to be inspected

Quality is easier to trust when the evidence is visible. This page gathers the current certificate scans and the factory checks behind every amplifier, and states plainly what we do not claim.

Current product certificates

The current MaikeAudio range is covered by China Compulsory Certification (CCC/3C) and CQC product certification. Open a scan to inspect the certificate and its schedule.

These are the only product certifications we state for the current range. High-resolution scans or clarification of the certificate scope are available on request.

Request certificate copies →

Factory process

Six checks from components to carton

  1. 01

    Component selection

    Key components are selected for the amplifier platform before production, with the bill of materials controlled in the factory.

  2. 02

    Circuit and chassis assembly

    Circuit boards, transformer, output stage and chassis are assembled in house around the same platform architecture.

  3. 03

    Bench measurement

    Each model is measured on the factory test bench, including its output, distortion and protection behaviour.

  4. 04

    Burn-in and load test

    Amplifiers are run under load before packing so early failures and thermal problems show up before shipment.

  5. 05

    Final inspection

    The finished unit is checked for controls, connectors, labelling and the packing list.

  6. 06

    Documented dispatch

    The model, configuration and shipment details are recorded so after-sales can trace the unit.

Clear limits

What we do not claim

No invented approvals

We list CCC/3C and CQC because the scans are available. We do not claim CE, RoHS or FCC approval without a current test report.

No performance without context

Published power and distortion figures belong to a defined test condition. Room SPL and coverage still depend on loudspeakers and acoustics.

No one-size-fits-all design

The selector is a starting point. The final amplifier, DSP and protection choices are checked against the project schedule.

Documents and after-sales, together

Download the manual for a specific model, or read the one-year warranty, spare-unit and repair terms before the equipment goes into service.

Need the certificate for a tender?

Tell us the model, destination and document format. Our team will send the available certificate scan and any clarification of its scope.

Contact MaikeAudio